top of page

TRACK RESURFACING WORKS

We have recently had significant resurfacing work completed on the hill, from Rolts to the entrance of Semi-Circle.


This was needed due to subsidence on the left hand side of the track and a degradation of the surface in various places.


We also repaired a large section of the return road, as this had been damaged due to heavy vehicles and frost in recent times.




556 views

Recent Posts

See All
bottom of page